Abstract
Off-site construction has become widely acknowledged for its advantages, such as saving time, enabling faster assembly, and being cost-efficient. The sector's rapid growth has driven the demand for more advanced and effective methods of construction scheduling. Construction scheduling is naturally complicated due to the numerous constraints it involves, including those connected to workforce and resource availability. Conventional approaches, like the Critical Path Method (CPM), fail to account for multiple constraints, which limits their effectiveness in practical project scenarios. This research presents a simulation-based Genetic Algorithm (S-GA) approach to develop optimal construction schedules while accounting for constraints in labour and resources. Reducing the total project duration is the objective of proposed method. The proposed S-GA framework enhances the ability to manage scheduling across all construction phases. A real-world case which contains a prefabricated bridge with 6 spans was conducted to assess the method. For comparison, traditional methods and the evolution algorithm (EA) were adopted, and the findings indicated that S-GA not only produced superior construction schedules but also operated with less computational time. Proposed S-GA generated the best construction schedule with shortest project duration within least computational time. As a result, the proposed approach offers an advanced scheduling method that is applicable to real-world construction projects. Project managers could use proposed method to make plans for their construction projects.
| Original language | English |
|---|---|
| Title of host publication | Proceedings of the 6th International Conference on Civil and Building Engineering Informatics (ICCBEI 2025), 8-11 January 2025, Hong Kong, China |
| Editors | Jack C. P. Cheng, Nobuyoshi Yabuki, Yantao Yu |
| Place of Publication | Hong Kong |
| Publisher | Hong Kong University of Science and Technology |
| Pages | 361-366 |
| Number of pages | 6 |
| Publication status | Published - 2025 |
| Event | International Conference on Civil and Building Engineering Informatics - Hong Kong, China Duration: 8 Jan 2025 → 11 Jan 2025 Conference number: 6th |
Publication series
| Name | Kalpa Publications in Computing |
|---|---|
| Volume | 22 |
| ISSN (Print) | 2515-1762 |
Conference
| Conference | International Conference on Civil and Building Engineering Informatics |
|---|---|
| Abbreviated title | ICCBEI |
| Country/Territory | China |
| City | Hong Kong |
| Period | 8/01/25 → 11/01/25 |
Fingerprint
Dive into the research topics of 'A simulation-based genetic algorithm schedule optimization method for bridge construction'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver