Abstract
Adopting the circular economy (CE) at the individual project level offers only a short-term perspective and neglects strategic, long-term CE transformation in construction. Accordingly, organisation-level CE adoption was identified as the more suitable approach, as it provides strategic, long-term, and consistent results across the construction projects. Consequently, developing a maturity model for construction organisations was identified as a promising approach as it guides organisational processes from the initial to the desired state. Therefore, this study provides a foundation for a CE Maturity Model for Construction Organisations by systematically analysing Key Process Areas (KPAs), addressing a gap in previous studies that focused mainly on conceptual discussions of CE maturity. Initially, CE indicators for construction organisations were identified, providing the basis for identifying KPAs, as explained in the literature review section of this paper. Subsequently, Delphi-based expert interviews were conducted with 20 experts to verify the suitability of the identified KPAs, assess their importance, and justify KPA descriptions. The results identified 19 KPAs relevant to construction organisations, which were categorised into four tiers by importance. Accordingly, the most important KPAs for construction organisations, grouped within the Tier 1 category, were “Circularity in building design”, “Material circularity improvement”, “Waste circularity improvement”, and “Greenhouse gas emissions reduction”. The other 15 KPAs are clustered under Tier 2, 3 and 4. Theoretically, this study helps fill the existing research gap on CE adoption in construction organisations, while, practically, it provides a roadmap for construction professionals to adopt CE by focusing on the KPAs.
| Original language | English |
|---|---|
| Title of host publication | Proceedings of the 14th World Construction Symposium: Towards a Regenerative Built Environment: From Foresight to Action, 10 - 11 July 2026, Hilton, Colombo, Sri Lanka |
| Place of Publication | Sri Lanka |
| Publisher | University of Moratuwa |
| Pages | 176-190 |
| Number of pages | 15 |
| DOIs | |
| Publication status | Published - 2026 |
| Event | World Construction Symposium - Colombo, Sri Lanka Duration: 10 Jul 2026 → 11 Jul 2026 Conference number: 14th |
Publication series
| Name | World Construction Symposium |
|---|---|
| Publisher | Ceylon Institute of Builders |
| ISSN (Print) | 2362-0935 |
Conference
| Conference | World Construction Symposium |
|---|---|
| Abbreviated title | WCS |
| Country/Territory | Sri Lanka |
| City | Colombo |
| Period | 10/07/26 → 11/07/26 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 13 Climate Action
Keywords
- Circular economy
- Construction Industry
- Construction Organisations
- Key Process Areas
- Maturity Model
Fingerprint
Dive into the research topics of 'Analysing key process areas in developing the circular economy maturity model for construction organisations'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver