TY - JOUR
T1 - Analysis of the use of e-procurement in the public and private sectors of the UK construction industry
AU - Eadie, Robert
AU - Perera, Srinath
AU - Heaney, George
PY - 2011
Y1 - 2011
N2 - Eadie et.al (2010a, 2010b) identified 20 advantages in the adoption of e-procurement within a construction organisation. The Glover report (2008) indicated that by the end of 2010 all public sector procurement should be electronic. The use of e-procurement within the construction industry has been inadequately researched. Martin (2009) examined quantity surveying organisations perspectives on the use of e-procurement across the United Kingdom. This paper seeks to address the knowledge gap that exists in the analysis of the level of usage of e-procurement within the construction industry. It compares the findings for the construction industry with other industries on company size and spend. Martin (2009) does not seek to investigate the size or spend on procurement activities of those quantity surveying organisations who have adopted e-procurement. This paper investigates the correlations between size, procurement spend and adoption of e-procurement in construction organisations comparing it with other industries. It concludes that the findings of Griloa and Jardim-Goncalves (2010) and European Commission (2007) were correct in suggesting that the AEC sector has been lagging behind other sectors in the adoption of e-procurement and provides a breakdown of the different types of organisations who currently use e-procurement. It further identifies the size of organisations which have implemented e-procurement within construction. On the client and consultant side in traditional contracts, company sizes of 21-50 employees make the highest use of e-procurement. This confirms that when analysing according to the size of organisation, construction organisations perform in a similar way to other industries as reported in Batenburg (2007) and Gunasekarana and Ngai (2008). However, this study indicates that very small companies may still be put off by the costs of software (corroborates De Boer et al, 2002; Kauffman and Mohtadi, 2004). The study proposes the types of construction organisation most likely to be utilising the benefits of e-procurement in construction by procurement spend and size. It also indicates that the deadlines in the Glover report (2008) relating to e-procurement in construction are unlikely to be met.
AB - Eadie et.al (2010a, 2010b) identified 20 advantages in the adoption of e-procurement within a construction organisation. The Glover report (2008) indicated that by the end of 2010 all public sector procurement should be electronic. The use of e-procurement within the construction industry has been inadequately researched. Martin (2009) examined quantity surveying organisations perspectives on the use of e-procurement across the United Kingdom. This paper seeks to address the knowledge gap that exists in the analysis of the level of usage of e-procurement within the construction industry. It compares the findings for the construction industry with other industries on company size and spend. Martin (2009) does not seek to investigate the size or spend on procurement activities of those quantity surveying organisations who have adopted e-procurement. This paper investigates the correlations between size, procurement spend and adoption of e-procurement in construction organisations comparing it with other industries. It concludes that the findings of Griloa and Jardim-Goncalves (2010) and European Commission (2007) were correct in suggesting that the AEC sector has been lagging behind other sectors in the adoption of e-procurement and provides a breakdown of the different types of organisations who currently use e-procurement. It further identifies the size of organisations which have implemented e-procurement within construction. On the client and consultant side in traditional contracts, company sizes of 21-50 employees make the highest use of e-procurement. This confirms that when analysing according to the size of organisation, construction organisations perform in a similar way to other industries as reported in Batenburg (2007) and Gunasekarana and Ngai (2008). However, this study indicates that very small companies may still be put off by the costs of software (corroborates De Boer et al, 2002; Kauffman and Mohtadi, 2004). The study proposes the types of construction organisation most likely to be utilising the benefits of e-procurement in construction by procurement spend and size. It also indicates that the deadlines in the Glover report (2008) relating to e-procurement in construction are unlikely to be met.
KW - procurement
KW - construction industry
KW - United Kingdom
UR - http://handle.uws.edu.au:8081/1959.7/uws:35937
UR - http://nrl.northumbria.ac.uk/6602/1/2011_39.content.08822.pdf
M3 - Article
SN - 1400-6529
VL - 16
SP - 669
EP - 686
JO - Journal of Information Technology in Construction
JF - Journal of Information Technology in Construction
ER -