T1 - Exploring effect of different resource qualities on process efficiency in construction pile installation
AU - Page, Dominic
AU - Hou, Lei
AU - Rahnamayiezekavat, Payam
AU - Antwi-Afari, Maxwell Fordjour
AU - Han, SangHyeok
AU - Moon, Sungkon
PY - 2023
Y1 - 2023
N2 - This paper presents the measured effects of different resource qualities on construction performance. The paper describes a recommended method, proposed with the concept of prediction by understanding the causal effect of process resources on consequent work efficiencies. The project team measured and compared the different arrangements of resources and their effects on on-site work efficiencies. The paper includes a field study of 15 operations (40 piles) in Mel-bourne, on several worksites of prefabricated piles and installations. It aimed to determine the causality between the set of delivered prefabricated piles and relevant work efficiencies. This field includes its purpose of generating and providing scientific evidence in effectively implementing an offsite operation. One of the critical factors affecting the efficiency of the installation process was confirmed to be the location of the longest section in the sequence. It took 21.8 minutes longer with the middle part of the installation if the longest section was designed to be in the middle of the whole prefabricated steel pile. The findings confirmed the need for holistic communication along the supply chain. The originality of this project is to provide a case study that offers archival evidence of the proposed model in a practical situation.
AB - This paper presents the measured effects of different resource qualities on construction performance. The paper describes a recommended method, proposed with the concept of prediction by understanding the causal effect of process resources on consequent work efficiencies. The project team measured and compared the different arrangements of resources and their effects on on-site work efficiencies. The paper includes a field study of 15 operations (40 piles) in Mel-bourne, on several worksites of prefabricated piles and installations. It aimed to determine the causality between the set of delivered prefabricated piles and relevant work efficiencies. This field includes its purpose of generating and providing scientific evidence in effectively implementing an offsite operation. One of the critical factors affecting the efficiency of the installation process was confirmed to be the location of the longest section in the sequence. It took 21.8 minutes longer with the middle part of the installation if the longest section was designed to be in the middle of the whole prefabricated steel pile. The findings confirmed the need for holistic communication along the supply chain. The originality of this project is to provide a case study that offers archival evidence of the proposed model in a practical situation.
UR - https://hdl.handle.net/1959.7/uws:74118
U2 - 10.3846/jcem.2023.19215
DO - 10.3846/jcem.2023.19215
M3 - Article
SN - 1822-3605
SN - 1392-1525
VL - 29
SP - 463
EP - 474
JO - Journal of Civil Engineering and Management
JF - Journal of Civil Engineering and Management
IS - 5
ER -