Fault current distribution and pole earth potential rise (EPR) under substation fault

M. Nnassereddine, J. Rizk, A. Hellany, M. Nagrial

    Research output: Contribution to journalArticlepeer-review

    4 Citations (Scopus)

    Abstract

    New high-voltage (HV) substations are fed by transmission lines. The position of these lines necessitates earthing design to ensure safety compliance of the system. Conductive structures such as steel or concrete poles are widely used in HV transmission mains. The earth potential rise (EPR) generated by a fault at the substation could result in an unsafe condition. This article discusses EPR based on substation fault. The pole EPR assessment under substation fault is assessed with and without mutual impedance consideration. Split factor determination with and without the mutual impedance of the line is also discussed. Furthermore, a simplified formula to compute the pole grid current under substation fault is included. Also, it includes the introduction of the n factor which determines the number of poles that required earthing assessments under substation fault. A case study is shown.
    Original languageEnglish
    Pages (from-to)499-507
    Number of pages9
    JournalInternational Journal of Emerging Electric Power Systems
    Volume14
    Issue number5
    DOIs
    Publication statusPublished - 2013

    Fingerprint

    Dive into the research topics of 'Fault current distribution and pole earth potential rise (EPR) under substation fault'. Together they form a unique fingerprint.

    Cite this