Abstract
The existing of the High Voltage (HV) infrastructure creates a special set of safety circumstances. Earthing system is one of the main elements to mitigate any unsafe conditions. Commissioning the earth grid certifies that the implemented system fulfills to the pertinent necessities. This paper endeavors to present vital information on how to perform the earth grid commissioning of an HV infrastructure. This paper will minutiae the minimum necessities to guarantee the test will symbolize the actual fault case that the design was based on. A flow chart diagram is established and presented in this paper to allow the determination of the most suitable injection route. The results of the multiple case studies are discussed and the results are shown in this paper.
Original language | English |
---|---|
Title of host publication | Proceedings of the 2013 IEEE 8th Conference on Industrial Electronics and Applications (ICIEA): 19-21 June 2013, Melbourne, Australia |
Publisher | IEEE |
Pages | 67-72 |
Number of pages | 6 |
ISBN (Print) | 9781467363204 |
DOIs | |
Publication status | Published - 2013 |
Event | IEEE Conference on Industrial Electronics and Applications - Duration: 19 Jun 2013 → … |
Conference
Conference | IEEE Conference on Industrial Electronics and Applications |
---|---|
Period | 19/06/13 → … |