Managing intragroup conflicts within project design teams during pre-contract stage that effect the project deliverables in Sri Lanka

D. M. H. Gunasekara, I. H. P. R. Indikatiya, B. A. K. S. Perera, Sepani Senaratne

Research output: Contribution to journalArticlepeer-review

2 Citations (Scopus)

Abstract

Purpose: The purpose of this study is to investigate the management of intragroup conflicts occurring in project design teams during pre-contract stages that affect the project deliverables of construction projects implemented in Sri Lanka. Design/methodology/approach: A qualitative approach with a case study research strategy was used in the study. The required empirical data were collected by conducting expert interviews and reviewing the documents used in four selected projects implemented in Sri Lanka. All the projects used traditional separated procurement systems and had re-measurement contracts. Manual content analysis was used to analyze the collected data. Findings: The study findings revealed the different types of intragroup conflicts that arise during the pre-contract stages of projects within project design teams of construction projects implemented in Sri Lanka and the causes and effects of those conflicts on project deliverables. The study recommends proactive strategies that can be adopted to manage those conflicts. Originality/value: A dearth of literature on the association between the intragroup conflicts that arise during the design stages of construction projects and project deliverables exists. This study bridged this research gap. It is novel because it reveals the impact of intragroup conflicts that occur during the pre-contract stages of construction projects on project deliverables and identifies several proactive strategies that will assist in managing those intragroup conflicts.
Original languageEnglish
Pages (from-to)406-424
Number of pages19
JournalConstruction Innovation
Volume23
Issue number2
DOIs
Publication statusPublished - 17 Feb 2023

Bibliographical note

Publisher Copyright:
© 2022, Emerald Publishing Limited.

Notes

WIP in RD

Keywords

  • Proactive strategy
  • Project deliverables
  • Intragroup conflicts
  • Design team
  • Construction projects
  • Pre-contract stage