Abstract
The design of wind power plant is formulated as a constrained optimization problem so as to minimize generation cost. Different variables and constraints are discussed. Though the results presented pertain to wind power plant without storage but the design optimization approach is general enough to be applicable to plants with storage facilities.
| Original language | English |
|---|---|
| Pages (from-to) | 110-113 |
| Number of pages | 4 |
| Journal | National Conference Publication - Institution of Engineers, Australia |
| Issue number | 91 pt 6 |
| Publication status | Published - 1991 |
| Event | Electric Energy Conference 1991 - EECON 91 - Darwin, Aust Duration: 10 Jun 1991 → 13 Jun 1991 |