Skip to main navigation Skip to search Skip to main content

Pipe integrity and cement quality evaluation in an Iranian gas-well workover operation by USI-tool logs analyzing

  • Hossein Ameri
  • , Meysam Motahari
  • , Pan Hu
  • Petroleum University of Technology, Tehran

Research output: Chapter in Book / Conference PaperConference Paperpeer-review

Abstract

Workover operation is an important part of the petroleum industry after drilling-production operations and their problems in a well. In this work, the USI (Ultra Sonic Imager) tool has been run for casing corrosion detection and cement bond evaluation in southern Iranian gas well. The interval that has been logged is from 3210 to 13.3m. The cement bond quality based on USIT results analysis and cement map is totally inappropriate with channeling, patchy, contaminated and free pipe (no appropriate separation between casing and formation). Nevertheless, from 3082 to 3210m (lower section), the cement quality is perfect and provides good zonal isolation. The CSR (Corrosion Summary Report) demonstrates the casing circumstances are proper, and no critical internal and external corrosion is seen. Furthermore, the metal loss value range is between a minimum 0.98% and a maximum 28.68%. Nonetheless, high metal loss percent might be due to different joints or collars with different thicknesses. The USIT results show that casing/liner corrosion is not in critical condition. Moreover, cement has not appropriated isolation level in some intervals, and thus, to prevent future workover operations, the squeeze cementing job is proposed, and the flow could be from completion string joints in some sections.
Original languageEnglish
Title of host publication85th EAGE Annual Conference & Exhibition, Oslo, Norway, 10-13 June 2024
Place of PublicationNetherlands
PublisherEuropean Association of Geoscientists & Engineers
Number of pages5
Volume1
ISBN (Electronic)9798331310011
DOIs
Publication statusPublished - 2024

Fingerprint

Dive into the research topics of 'Pipe integrity and cement quality evaluation in an Iranian gas-well workover operation by USI-tool logs analyzing'. Together they form a unique fingerprint.

Cite this