Abstract
Purpose: The purpose of this paper is to empirically compare the risk factors in public-private partnership (PPP) projects in developing and developed countries, represented by Ghana and Hong Kong, respectively. Design/methodology/approach: A structured questionnaire survey was conducted with PPP practitioners in Ghana and Hong Kong. In total, 103 valid responses were received for analysis. Kendall's coefficient of concordance and mean ranking were used for data analysis. Findings: The results show that respondents from Ghana ranked country risk factors higher, whereas their Hong Kong counterparts ranked project-specific risks higher. The top five significant risks in Ghana are corruption, inflation rate fluctuation, exchange rate fluctuation, delay in project completion and interest rate fluctuation. In Hong Kong, the top five significant risk factors are delay in land acquisition, operational cost overruns, construction cost overruns, delay in project completion and political interference. Originality/value: The results of the study inform international investors of the appropriate risk mitigation measures and preventive actions to use when engaging in PPP arrangements in any part of the world. Further, governments who are yet to use the PPP concept would be informed of the prevailing risk factors in other neighbouring countries (i.e. developing or developed countries).
Original language | English |
---|---|
Pages (from-to) | 204-223 |
Number of pages | 20 |
Journal | Construction Innovation |
Volume | 17 |
Issue number | 2 |
DOIs | |
Publication status | Published - 2017 |
Keywords
- Ghana
- Hong Kong (China)
- developed countries
- developing countries
- public-private sector cooperation