Skip to main navigation Skip to search Skip to main content

Methodology for estimating embodied carbon in construction supply chains through a blockchain-based system

  • Navodana Rodrigo

    Western Sydney University thesis: Doctoral thesis

    Abstract

    The building sector contributes up to 36% of carbon emissions emphasising the importance of carbon management. Embodied Carbon (EC) and Operational Carbon (OC) are classified as two main types of carbon emissions in buildings. Zero carbon projects have gained popularity nowadays where OC is reduced to zero, which enables EC to increase. The focus should have been to reduce overall emissions. Therefore, this research focuses on reducing EC, for which, estimating and managing EC plays an important role. The current EC estimating databases and tools could result in inaccurate EC estimates due to various reasons, such as different system boundaries, different geographical locations, lack of standardisation and so forth. To address prevailing shortfalls, this study aimed at developing an accurate methodology for estimating EC in construction supply chains using the value chain concept and blockchain technology.
    A Supply Chain based Embodied carbon Estimating Method (SCEEM), a conceptual method that incorporates the economic concept of value chain, was developed to estimate EC accurately. Case studies on building construction projects were used to estimate EC using SCEEM to test and internally validate the conceptual method. Estimated EC values using SCEEM were compared with EC estimates prepared using existing EC databases and tools to externally validate the conceptual model. The comparative evaluation emphasised that SCEEM provided accurate and consistent EC estimates.

    The findings of the research have several contributions to theory and practice. SCEEM is a supply chain based novel methodology that has incorporated the economic concept of value chain and it is implemented through blockchain to estimate EC accurately. Providing the accurate methodology, SCEEM fills the void that existed in construction. The methodology utilised in this research to select a suitable blockchain platform and develop the prototype system provides an exemplar for academics and practitioners to adopt and use reliably. The key contribution to practice is the BEC Estimator, a prototype system that incorporated SCEEM to accurately estimate EC in construction supply chains. The BEC Estimator assists the EC contributors in accounting and tracking their EC transactions. Stakeholders could benefit from the BEC Estimator to produce EC estimates and contribute to EC reductions through decision making.
    Date of Thesis submission2022
    Original languageEnglish
    Awarding Institution
    • Western Sydney University
    SupervisorSrinath Perera (Supervisor), Sepani Senaratne (Supervisor) & Xiaohua Jin (Supervisor)

    Cite this

    '